Cope Architecture
South Lincoln Elementary School — exterior view
K–12 Education

South Lincoln Elementary Additions & Renovations

LocationFayetteville, Tennessee
ClientLincoln County Schools
MarketK–12 Education
ScopeMedia Center Renovation & New 3,800 SF Media Center Addition
RoleArchitect — Renovation & Addition Design
Turning a Media Center Into a Cafeteria

Additions and renovations for South Lincoln Elementary School

The South Lincoln Elementary School project was delivered in two coordinated phases for Lincoln County Schools. The first renovated the school's existing Media Center into an additional cafeteria dining space, giving the school much-needed capacity for meal service. The second constructed an entirely new, freestanding media center on campus to replace the space the school gave up.

Together, the two phases let South Lincoln Elementary grow its dining capacity without sacrificing the media center program that came before it — reusing existing square footage for one need while building purpose-built new space for the other.

South Lincoln Elementary School — exterior view
Renovating the Existing Media Center

A dining space built from reclaimed square footage

To create the new cafeteria dining space, all of the existing Media Center's finishes were demolished down to the structure and rebuilt with new walls, floors, and ceilings. Rather than discarding the room's furnishings outright, the existing Media Center furniture was reutilized by the school, keeping the renovation efficient and reducing waste.

The scope also reached beyond finishes: HVAC systems serving the space were upgraded, and Life Safety Systems were brought up to current standards as part of the same renovation — ensuring the repurposed room performs as well mechanically as it does architecturally.

South Lincoln Elementary School — exterior view
A New 3,800 SF Media Center

New construction that ties back into the existing campus

In place of the media center program that moved into the renovated cafeteria wing, a new 3,800-square-foot media center was constructed in the courtyard between the school's existing additions. The new building houses a workroom and conference room in addition to the media center's main reading and resource space, along with a restroom and an IT room to support it.

New canopies and sidewalks were built to connect the new media center back to the rest of the existing campus, and longstanding site drainage problems in the courtyard were corrected as part of the same scope of work — leaving the connecting spaces functioning better than they had before construction began.

← Back to Portfolio
Contact Us

Start a project with Cope Architecture

Contact Us →
Careers

Build your career in Knoxville

See Open Positions →